The water storage capacity includes PHE Domestic storage of 2,50,000 litres, WTP storage of 2,50,000 litres, and Fire water storage of 5,00,000 litres.
The campus is supported by 6 x 2000 kVA working transformers and 2 x 2000 kVA standby transformers, with a total sanctioned load requirement of 11,978 kVA.
The average waiting time for lifts is less than 25 seconds. The lift configuration includes:
Tower A: 6 high-zone passenger lifts and 6 low-zone passenger lifts
Tower B: 6 high-zone passenger lifts and 6 low-zone passenger lifts
Service lifts: 4
Shuttle lifts: 4
F&B lift: 1
The lift make is Mitsubishi.
The stack parking system is designed with widths of 2.1 m, 2.2 m, 2.3 m, and 2.4 m. Height provisions are as follows:
SUV: Bottom – 2000 mm, Top – 1550 mm
TB: Bottom – 1770 mm, Top – 1770 mm
Sedan: Bottom – 1550 mm, Top – 1550 mm
The parking system vendor is R R Parkon.
From the 1st to the 16th floors in Towers A and B, each floor has 4 toilet sections, covering Gents, Ladies, Handicap, Janitor, and Pantry room facilities. On the Ground Floor, 2 sets of toilets are available, along with dedicated F&B area toilets.